CRC Distribution Blog

CRC Distribution Blog


3/13/2021 1:48 PM
An engineer at Curtin Maritime needed molded rubber seals delivered in 4 weeks or less to meet their vessel's dry dock installation...
Read More
3/11/2021 11:47 AM
Catastrophic bearing failures at two Great Lakes shipping companies prompted the marine engineers to re-evaluate the water-lubricated composite bearings installed on...
Read More
3/9/2021 6:04 PM
Expensive parts and long lead times for simple replacement items were causing headaches for the maintenance department at an aluminum plant in the...
Read More